Modification of track circuits for the Carranza-Aranguren section
Modification of track circuits for the Carranza-Aranguren section
Due to the electrification of section Carranza-Aranguren the track circuits were modified as these were conventional track circuits adapted to a non-electrified track.
This modification consists of:
Removing of cables of 1x4mm section, including its collection in coils and its relocation.
Supply and overhead wires in existing chanelling of 4x1.5 mm.
Insulated gasket of 54 kg. (1 wire) of 9 m long, including all materials. Fully assembled.
Supply and installation of inductive gasket.
Reform of cabinets of track circuits for adaptation to the new situation, including materials, engineering, testing and commissioning.
Reform cabinets for track circuits for adaptation to the new situation, including materials, engineering, testing and commissioning.