Electronic interlocking at Candás Station
To increase the Safety on the environment of the Candás station the following actions were taken, between kps 036/053 and 039/208:
- Installation of a new electronic interlocking S3e of ENYSE technology in the station of Candás.
- Supply and installation of new wayside signals with their corresponding ASFA balises.
- Supply and installation of new jointless track circuits with Audio-frequency technology.
Supply and installation of:
- Electric Point Machines with its corresponding claw locks mechanisms.
- Cabinets and Junction Boxes.
- Installation of the power system.
- Cable path and other associated Civil Works.
- Supply and laying of cables.
- Signalling Equipment Room.
- Dismantling and disposal of the existing installations.