January 21, 2022, Oviedo (Spain) |
Enyse has been awarded with the contract for the design and execution of the new electronic interlocking for Oviedo station, along with the two-way automatic block with its collateral stations, El Caleyo and Lugones.
The contract includes the execution of the works associated to the design, manufacturing, supply, installation, testing and commissioning of enyse’s EiS23 electronic interlocking for the stations of Oviedo and Lugones, which will replace the existing ones.
Other works in the scope of the contract include
Works will be carried out without interruption to the railway traffic in the double line, currently providing commuter services as well as conventional Main Line services for passengers and freight to León and beyond. The provided system offers a wide warranty period, based in the high availability figures given by the proposed equipment.